Air preheater SMT 209

Purpose: air preheating supplied to cupola furnace SMT 208.

Capacity on air, m3/h8000
Preheated air temperature, ОС400
Gas consumption, m3/h210
Mass, kg4770
Dimensions, mm7100х2350х2550
Normative documentTU 22-4993-81
OKP code 484571

The equipment is mounted in enclosed space with positive temperature.

Air being heated up in air preheater, raw material and coke in specified ratio are fed into melting furnace – cupola furnace wherein raw material is melting when fuel burning. Molten mass leaving the cupola furnace is headed to multi roller centrifuga and processed into mineral cotton.